Cable Routing

Submitted by xjcdadmin on Thu, 06/27/2013 - 10:26
Model(s)

CABLE ROUTING

*1: Pass front brake switch lead and right handlebar switch lead behind air hose.
*2: Pass brake hose and throttle cable between air hose and meter stay.
*3: Pass clutch cable, clutch switch lead, left handlebar switch lead and starter cable behind air hose.

*4: Pass speedometer cable outside meter stay, in front of fairing fitting stay, and outside brake hose.
*5: Pass horn leads in front of brake joint.
*6: Pass front flasher light leads between horn and brake joint.
*7: Pass wire harness between under bracket and wire harness stay.

*1: Fasten ground lead together left ignition coil.
*2: Pass clutch cable between air cleaner joint #3 and #4