REMOUNTING ENGINE
1. Refer to engine removal. Reverse those removal steps that apply.
2. Tighten:
• Engine mount bolts
Engine Mounting Bolt:
Front, upper: 4.2 m-kg (30 ft-lb)
Rear: 9.0 m-kg (65 ft-lb)
Down tube: 3.8 m-kg (27 ft-lb)
3. Connect:
• Pickup coil lead
• Generator lead
• Neutral switch lead
• Oil level switch lead
• Starter motor lead
• Crankcase ventilation hose
• Battery leads
• See CHAPTER 7 "Cable Routing" for proper cable, lead, and hose routing.
• Connect the battery positive lead first.
• Make sure that the cables are not twisted.
• Be careful not to pinch the leads.
4. Install:
• Carburetors
5. Connect:
• Throttle cable
• Choke cable
6. Tighten:
• Air cleaner case mount bolts 1.0 m-kg, (7.2 ft-lb)
7. Install:
• Fuel tank
• Seat
8. Add:
• Engine oil
3.5 L (3.08 Imp qt, 3.70 US qt)